The MTA has released a draft systemwide schedule for when LIRR service to Grand Central begins. Below, you will find timetables that show service divided into 17 different segments. These are based on predominant service patterns.
The timetables show each train that stops at the stations covered; when they stop at Jamaica and their western terminals; and key intermediate station stops, such as Mineola. Not all intermediate stops are shown, especially at rush hour.
Trains will no longer have scheduled connections at Jamaica, so these schedules show train times only at stations they directly serve. Diesel trains on the Montauk, Oyster Bay, and Port Jefferson Branches will continue to show J (Jamaica) and/or T (Babylon/Huntington/Ronkonkoma) transfer opportunities. These do not originate or terminate at one of our primary western terminals, so the notes allow us to show how to travel to or from those terminals.
These timetables are drafts and are subject to change while we continue to refine the schedule. Final timetables will be available in the fall. When those are ready, they will be posted on our website.